Flooring for Architects

A flooring partner who can execute detailed drawings as-drawn — complex transitions, mixed materials, and layouts that need a craftsman's hand.

Flooring details in a construction set — material transitions between rooms, herringbone or mixed-width layouts, thresholds between hardwood and tile — are easy to draw and hard to install well. We work from your drawings and specs, not just a verbal description of "wood floor, kitchen area."

We'll flag constructability issues in subfloor height, transition thickness, or moisture conditions during the review phase, before they surface as an RFI mid-construction.

We install hardwood, engineered wood, tile, natural stone, luxury vinyl, and laminate, so a mixed-material spec doesn't mean managing multiple subs.

How We Work

Working With Architects

  • Installs executed from construction drawings and finish schedules, not verbal shorthand
  • Constructability flags on subfloor height, transitions, and moisture during review — before an RFI
  • One sub across hardwood, engineered wood, tile, natural stone, LVP, and laminate for mixed-material specs
  • Comfortable with detailed layouts — herringbone, mixed-width, material transitions
  • Licensed CSLB C-15 (#1060673), insured, workmanship warranty on the installed work

Specifications

What Architects Actually Need From a Flooring Sub

The published numbers behind a floor that passes: tolerances, test methods, and service conditions — with the standard each one comes from.

Change in level: the numbers that govern every transition

The 2010 ADA Standards, Section 303, set the limits a floor transition has to live inside. Changes in level up to ¼ inch may be vertical. Between ¼ inch and ½ inch they must be beveled at a slope no steeper than 1:2. Anything greater than ½ inch has to be ramped and comply with Section 405 or 406. Those three numbers decide whether a material change at a doorway is a reducer, a bevel, or a redesign — and they are far easier to resolve on the drawing than in the field.

2010 ADA Standards, §303

Flatness belongs in the spec, with its method

Flatness tolerance is method-dependent, so a specification that states one without the other is ambiguous. Mechanical fasteners 1½ inches and longer: 3/16 inch in 6 feet or ¼ inch in 10 feet. Glue-down, floating, or shorter fasteners: 1/8 inch in 6 feet or 3/16 inch in 10 feet. NWFA also notes the distinction worth writing in: the floor does not need to be level in most situations, but it does need to be flat.

NWFA Installation Guidelines

Name the right test for the right substrate

ASTM F2170 (in-situ relative humidity) is the recognised method and applies to lightweight concrete; ASTM F710 governs the surface contaminants that defeat adhesive bond. ASTM has specifically disallowed ASTM F1869 for lightweight concrete, so specifying calcium-chloride testing alone can leave a project without an enforceable moisture criterion. Electronic surface meters per ASTM F2659 are useful for screening but are explicitly not a go/no-go determination.

NWFA Installation Guidelines / ASTM

Service conditions are part of the design

NWFA defines appropriate conditions for solid wood flooring as an interior environment held between 30% and 50% relative humidity and 60–80°F, and the guidelines state the HVAC should not be shut down for prolonged periods. Over radiant, the finished wood surface must never exceed 80°F unless the flooring manufacturer specifies otherwise, and setback thermostats that swing a room more than 5°F a day should not be used. In a building that will sit unconditioned between phases, those constraints belong in the drawings, not in a closeout conversation.

NWFA Installation Guidelines

These are the requirements the standards set, not a guarantee of outcome on any particular job. Always confirm current requirements with the issuing body and with the flooring manufacturer, whose written instructions govern where they are stricter.

What We Install

Flooring Capabilities

A full range of flooring for your projects — installed to spec, on schedule.

For the Trade

Frequently Asked Questions

What are the ADA limits on a floor transition?

Section 303 of the 2010 ADA Standards sets three thresholds. A change in level of ¼ inch or less may be vertical. A change between ¼ inch and ½ inch must be beveled at a slope no steeper than 1:2. Anything above ½ inch must be ramped and comply with Section 405 or 406. In practice this is what decides whether two adjacent materials can meet flush, need a reducer, or need their build-ups reconciled — which is a drawing-stage decision, not a field one.

What flatness tolerance should the specification carry?

Whichever one matches the attachment method, and the specification should state both. NWFA calls for 3/16 inch in 6 feet or ¼ inch in 10 feet where mechanical fasteners of 1½ inches or longer are used, and 1/8 inch in 6 feet or 3/16 inch in 10 feet for glue-down, floating, or shorter fasteners. It is also worth writing in the distinction NWFA draws explicitly: the floor does not need to be level, it needs to be flat.

Which moisture test should I name for a concrete slab?

ASTM F2170 for in-situ relative humidity, which is the recognised method and is valid for lightweight concrete, together with ASTM F710 for surface cleanliness and contaminants. Avoid relying on ASTM F1869 alone: ASTM has specifically disallowed it for lightweight concrete. Electronic surface meters under ASTM F2659 are appropriate for quickly locating where to test, but the guidelines are explicit that they are not to be used for a go/no-go determination.

Can wood flooring go over radiant heat?

Yes, and the constraints are specific enough to design around. The finished wood surface must never exceed 80°F unless the flooring manufacturer specifies otherwise; ASHRAE puts the comfortable range for a heated floor surface at 70–80°F; and NWFA states that setback or programmable thermostats varying a room by more than 5°F per day should not be used over a wood floor. Those limits affect the heat-loss calculation and the floor build-up, so they are worth resolving with the mechanical engineer before the assembly is fixed.

Standards Cited

External links are provided for reference and were verified live on 29 August 2026. Standards are revised over time — confirm the current edition with the issuing body.